Downtown Miami Luxury Condominium
The Challenge
Coastal Development Partners was developing a 32-story luxury condominium in downtown Miami. The project required hurricane-resistant construction, high-end finishes, and sophisticated MEP systems. Florida Building Code High-Velocity Hurricane Zone (HVHZ) requirements added significant complexity and cost.
Our Solution
Our Florida-based team provided specialized residential estimating for high-rise construction. We performed detailed takeoffs for impact-resistant glazing, reinforced concrete, and hurricane-rated roofing. Our cost consultants developed a detailed phasing plan to optimize construction scheduling around hurricane season. We also provided detailed interior finish takeoffs for luxury unit specifications.
Services Provided
- residential-estimating
- material-takeoffs
- cost-consulting
The Results
- 100% accuracy on final estimate
- HVHZ compliance achieved
- $1.7M in schedule optimization savings
- Project completed on time despite hurricane season
- 100% unit pre-sales achieved before completion
Client Testimonial
"Apex Accuracy Estimating's Florida team understood HVHZ requirements better than anyone we worked with. Their detailed takeoffs for hurricane-resistant materials saved us from costly change orders during construction."
— Samantha Martinez, Development Director, Coastal Development Partners